
Jocotepec’s José Santana Street remodel more than 65% complete
Work began on September 20, 2023
The work on José Santana Street in the downtown area of Jocotepec is more than…More
The work on José Santana Street in the downtown area of Jocotepec is more than…More
Almost four months after the start of construction on Iturbide Street in San Juan Cosalá,…More
The construction of 29 commercial spaces in the El Chante plaza is 60% complete. The…More
The Lakeside area will have its own Spanish bird guide illustrating 104 of the species…More
Lucha Libre wrestling in public spaces returned to Jocotepec, but this time in the delegation…More
The faith of more than 10,000 people was greater than the rainy weather when the…More
The patron saint festivities in Jocotepec 2024 closed with a flourish on Monday, January 22,…More
On the afternoon of January 19, a family was devastated after bloody water from the…More
Much like in Jocotepec Centro, San Juan Cosalá is suffering from inconsistent trash collection. Trash…More
A problem that has not been solved in Jocotepec is garbage collection. Before the patron…More